Shaw Group – South Hook LNG

South Hook LNG terminal is an LNG regasification terminal near Milford Haven and is the largest LNG terminal in Europe. Together with the smaller Dragon LNG terminal it can handle up to 25% of the UK’s gas requirement. The first tanker docked on 20 March 2009.

The terminal was designed and built by CB&I. At construction peak, some 2,500 people were employed on site. Despite starting work some 3 months later than the nearby Dragon LNG terminal (which has only one LNG tank compared to the 5 at South Hook), South Hook was the first of the two to receive LNG and send natural gas into the national gas network.

Our planning service was provided for the piping installation for Shaw Group where we maintained the full schedule including resources, labour and six week look-ahead projections, using exported Primavera P3 information we created s-curves and histograms presented at weekly client meetings (CB&I). Critical Path Analysis, Resource Levelling, EVM, Baseline Schedule Variance methods we implemented and reported to ensure progress was achieved.