Ledwood – VDU Refractory Replacement

Working as part of the Ledwood engineering team for the fabrication and installation of a VDU refractory system, on EPC shutdown project on the Valero petroleum refinery in Pembrokeshire. The project included the design, fabrication, assembly and installation from their workshops in Pembroke Dock, transport via the local docks and installation at the Refinery in Pembroke.

We provided schedule setup and updating, and redeveloped and designed the reporting documentation which is now used throughout the company as a standard format.

 

http://www.ledwood.co.uk/